
July 18th: Weekly Design Links
“Washing one’s hands of the conflict between the powerful and the powerless means to side with the powerful, not to be neutral. ” ― Paulo Freire
A weekly links post on Tuesday? Yep, the times they are a changing… Also, the layout has been altered a little–nothing crazy. This is Medium after all and you can only go so far.

If you need more of these links, like every day – go to CreativeLinks.Club and sign up for the email list. You’ll get five art & design links everyday. And now, without further ado, let the links commence.
Web Design



Stealing Your Way to Original Designs • http://danmall.me/articles/stealing-your-way-to-original-designs/
Telepathy Rebrand & Redesign • https://www.dtelepathy.com/
What to follow to stay updated on design systems? • https://product-unicorn.com/what-to-follow-to-stay-updated-on-design-systems-30a330d2161f
UI



A Primer on Android navigation • https://medium.com/google-design/a-primer-on-android-navigation-75e57d9d63fe
Designing Adaptive Icons • https://medium.com/google-design/designing-adaptive-icons-515af294c783
Case Study: Inconsiderate User Interface inflicts financial losses • https://stateofprogress.blog/case-study-inconsiderate-user-interface-inflicts-financial-losses-e0de32ebde84
Art



CTRL+X: Street Artists “Delete” Graffiti with a Painted Anamorphic Illusion • http://www.thisiscolossal.com/2017/07/ctrlx-street-artists-delete-graffiti-with-a-painted-anamorphic-illusion
Pepe’s Creator Is Trying to Save His Lovable Stoner Frog from the Alt-Right • https://www.artsy.net/article/artsy-editorial-pepes-creator-save-lovable-stoner-frog-alt-right
A Brief History of Polaroids in Art, From Ansel Adams to Andy Warhol (And Beyond) • https://www.artsy.net/article/artsy-editorial-history-polaroids-art-ansel-adams-andy-warhol
Graphic Design/Branding





Yeye Design • https://www.behance.net/gallery/54492303/Chang
We Are Brandless • https://brandless.com
Evolution of the LEGO logo • http://www.logodesignlove.com/lego-logo
New Logo for Philadelphia University and Thomas Jefferson University • http://www.underconsideration.com/brandnew/archives/new_logo_for_philadelphia_university_and_thomas_jefferson_university.php
SANKEO — Brand design • https://www.behance.net/gallery/54505955/SANKEO-Brand-design
Typography


10 Things I Learned at Typographics NYC • https://toky.com/journal/2017/07/07/typographics-nyc
Venue is a New, Oldschool Typeface for Rockers at Heart • https://medium.com/@roblevintennis/illustration-teardowns-soulful-isometrics-ed5caf0fdb71
Illustration/3D



OBSIDIAN — pitch black drawings • https://www.behance.net/gallery/53822839/OBSIDIAN-pitch-black-drawings
Illustration Teardowns: Soulful Isometrics • https://medium.com/@roblevintennis/illustration-teardowns-soulful-isometrics-ed5caf0fdb71
Recycled park • https://www.behance.net/gallery/54429903/Recycled-park
Work

Dumb Questions for Smart Designers • http://dumbquestions.co/
…and that’s all for this week
